简线建筑办公室,上海 / 简线建筑SIM

本案为SIM簡線建築位于上海的办公室,空间设计仍然延续了形随机能,纯粹简单的设计理念.我们尝试将两间狭长的单室打通合并成一个长宽相等的空间后,在室内营造出一个有入口、楼梯、夹层和屋顶的新建筑.从室内建筑到家具设备产品仿佛都在回应二十世纪建筑和产品设计鼎盛的年代。

This project is the office of SIM Simplify Architecture in Shanghai. The design of the space continues the concept of pure simplicity in form and function. We tried to create a new building with an entrance, staircase mezzanine and roof by merging two long and narrow single rooms into one space of equal length and width.From the interior architecture to the furniture and equipment products, it seems to be a echo to the heyday of 20th century architecture and product design.

▼室内概览,overview of the interior © WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

▼夹层概览,overview of the mezzanine floor© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

轻与重
Light & Heavy

夹层围栏呼应悬挑桌面的关系,削弱结构的厚重感。纤薄的金属层板和室内厚重的体块呈对比,突出立面的结构层次。

The layered fence resonates with the overhanging tabletop, lessening the heaviness of the structure. The slim metallic sheets contrast with the bulkiness of the indoor architecture, highlighting the stratification of the facade.

▼望向入口区域,view towards the entrance area© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

▼办公区概览,overview of the office area © WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

▼从办公区望向夹层,view from office area towards mezzanine© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

厚与薄
Thick & Thin

金属板焊接制作的工作桌和木板,楼梯桌面不同厚度的穿插使用让空间的层次感更加丰富多样。

Desks fabricated by welding metal sheets and wooden stair tabletops with varying thickness are interspersed, enriching the sense of depth in the space.

▼工作桌面,desk detail© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

简线建筑办公室,上海 / 简线建筑 SIM

▼桌椅细部,close-up of desk and chair© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

简线建筑办公室,上海 / 简线建筑 SIM

形随机能
Form Follows Function

空间中依然沿用以往常用的材质。我们相信纯粹干练的设计语言功能处理,胜过一切装饰主义带来的使用感受和视觉体验。

In this space, we continue to utilize materials commonly used before. We believe that a pure and concise design language excels in functionality over any sensation and visual experience brought about by ornamentation.

▼夹层下空间一角, onecorner of the space under the mezzanine© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

▼通向夹层的楼梯,staircase leading to mezzanine© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

简线建筑办公室,上海 / 简线建筑 SIM

▼夹层工作区, working space on the mazzenine floor© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

经典 末來
Classics & Future

产自2002年的iMACG4经过改造后内置了macmin的心脏后,我们成功复活了工业设计年代的经典产品。从二手家具店淘到的1960年代来自瑞士的LP唱片机柜除了设备本身的功能外这还是一组文件柜。

The iMAC G4 from 2002 has been retrofitted with the heart of a Mac Mini. This allowed us to successfully revive a classic product from the era of industrial design. From a second-hand furniture shop, we sourced a Swiss LP record player cabinet from the 1960s. Apart from the equipment’s function, it also serves as a filing cabinet.

▼LP唱片机柜,a Swiss LP record player cabine © WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

▼摆件细部,detail of the displayed objects© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

过去 当代
Amanta 1970s

Mario Belini为C&Bitalia设计的 Vintage Amanta 休闲椅,产自上世纪70年代.采用Fiberite(玻璃纤维增强聚酯)框架搁在4个球。

The Vintage Amanta leisure chair, designed by Mario Bellini for C&B Italia, hails from the 1970s. It features a Fiberlite (fibre-glass reinforced polyester) frame resting on four balls.

▼Vintage Amanta 手稿© Mario Belini

简线建筑办公室,上海 / 简线建筑 SIM

▼Amanta休闲椅© WM STUDIO

简线建筑办公室,上海 / 简线建筑 SIM

▼一层平面图,1st floor plan © WM STUDIO

▼夹层平面图,mezzanine floor plan© WM STUDIO

项目名称:STUDIO SH
项目类型:办公空间
项目位置:上海
项目面积:145㎡
设计机构:SIM簡線建築
主案设计:林薰
项目摄影:WM STUDIO

Project Name: SIM OFFICE SH
Project Type: Office Space
Project location: Shanghai
Project area: 145㎡
Design agency: SIMPLELINE STUDIO
Main project design: Xun Lin
Project Photography: WM STUDIO

More:简线建筑(联系邮箱|contact:Hey_Beomgae@hotmail.com)

正文完
更多资讯,敬请关注「走访建筑」微信公众号😘
post-qrcode